PART 1 - GENERAL
1.1 SECTION INCLUDES
- Noise-reducing impact insulation systems for Wood Flooring, Laminate, Carpet and Tile.
1.2 RELATED SECTIONS
- Section 09 64 00 - Wood Flooring
- Section 09 62 19 - Laminate
- Section 09 30 00 - Tile Setting
1.3 REFERENCES
-
U.S. Department of Housing and Urban Development (HUD): Guide to Airborne, Impact and Structure Borne Noise Control in Multi-famiy Dwellings.
- American Society of Testing and Materials (ASTM)
- ASTM D5116 Standard Guide for small-scale environmental chamber determinations of Organic Emissions for Indoor Material/Products.
- ASTM C627 Standard Test Method of Evaluating Ceramic Tile Installation Systems using the Robinson-Type Floor Test.
- ASTM E1007 Standard Test Method for Field Measurement of Tapping Machine Impact Sound Transmission through Floor-Ceiling Assemblies and Associated Support Structures.
- ASTM E2179 Standard Test Method for Laboratory Measurement of the Effectiveness of Floor Coverings in Reducing Impact Sound Transmission through Concrete Floors.
- ASTM F1869 Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor using Anhydrous Calcium Chloride.
-
Leadership in Energy and Environmental Design - LEED ®.
- LEED is an internationally recognized green building certification system, providing third-party verification that a building or community was designed and built using strategies aimed at improving performance across all the metrics that matter most: energy savings, water efficiency, CO2 emissions reduction, improved indoor environmental quality, and stewardship of resources and sensitivity to their impacts.
1.4 SYSTEM DESCRIPTION
- Performance Requirements: Provide recycled rubber resilient underlayment padding, which has been manufactured and installed to maintain performance criteria stated by manufacturer without defects, damage or failure..
1.5 SUBMITTALS
- Submit under provisions of Section 01300.
- Product Data: Manufacturer's data sheets on each product to be used, including:.
- Installation Instructions.
- LEED Documentation.
- Selection Samples: For each product specified, two samples will be provided for approval.
1.6 QUALITY ASSURANCE
- Manufacturer's Qualifications: The manufacturer shall be a firm with a minimum of four years of successful experience in manufacture of products with similar requirements
- Installer Qualifications: The installer shall be a firm with a minimum of two years of successful experience in installation of products with similar requirements.
1.7 DELIVERY, STORAGE AND HANDLING
- Store products in manufacturer's unopened packaging in a clean dry environment, until ready for installation.
- Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.
1.8 PROJECT CONDITIONS
- Maintain environmental conditions (temperature, humidity and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
PART 2 - PRODUCTS
2.1 SUPPLIER
- Primary Acoustics LLC, 2801 Sisson Street, Baltimore, MD 21211-2902. Tel: 410338.1122. Fax: 410.338.1124. Toll free: 866.388.8833. Web site: www.primaryacoustics.com
- Substitutions: Not permitted.
- Requests for substitutions will be considered in accordance with provisions of Section 01600.
2.2 PRODUCT
- VerdeX 3mm-20mm recycled rubber Acoustical Floor Underlayment Impact Sound Insulation supplied by Primary Acoustics LLC.
2.3 NOISE-REDUCING IMPACT INSULATION SYSTEM FOR WOOD FLOORING, LAMINATE, CARPET, CERAMIC TILE FLOORING
- Acceptable Product: VerdeX®
- Physical Characteristics:
- Made from 100% recycled SBR (Styrene-Butadien Rubber) tire rubber.
- 3mm -20mm
- 48 inches wide rolls
- Material Weight 1.8 lb/ft2
PART 3 - EXECUTION
3.1 EXAMINATION
- Do not begin until substrates have been properly prepared.
- If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.
3.2 PREPARATION
- Clean surfaces thoroughly prior to installation.
- Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
3.3 INSTALLATION
- Install in accordance with manufacturer's instructions.
3.4 PROTECTION
- Protect installed products until completion of project.
- Touch-up, repair or replace damaged products before Substantial Completion..
END OF SECTION